Prepare electrical routes
Complete the planned electrical conduit work supporting the upgrade and subsequent construction stages.
Rental Car Facility Fueling Upgrade Design — Kauai, Hawaii
A proposed fleet fueling upgrade expands from two dispensers to six while retaining 10,000 gallons of existing gasoline storage.
Proposed fueling-system upgradeKauai, Hawaii
Explore the proposed design ↓
An underground product-piping failure prompted the replacement of all aboveground and underground product piping. The facility’s vehicle volume also called for more dispensing capacity, while its two existing 5,000-gallon gasoline tanks provided ample storage.
ZE reviewed available site photographs, field measurements and existing-condition information to inform the design.
ZE developed fueling-system design drawings for six proposed dispensers, replacement product piping, upgraded tank-top equipment and a new automatic tank gauge (ATG). The design fits these improvements into the established vehicle-servicing area.

The proposed system replaces the product piping and adds a new transition sump and dispenser containment sumps. Aboveground steel piping connects with 2-inch UL 971 double-wall flexible underground product piping.
The retained aboveground storage tanks (ASTs) receive tank-top equipment upgrades. New tank gauging, leak detection, high-level alarms and coordinated emergency shutoff equipment are included in the design.
The four-phase construction plan coordinates the fueling upgrade with the facility’s wash and vacuum operations. During the main work, fueling is planned to move to the nearby fueling facility.
Complete the planned electrical conduit work supporting the upgrade and subsequent construction stages.
Provide the temporary vacuuming arrangement needed to support vehicle servicing during the main work.
Replace product piping, expand dispensing and upgrade tank equipment and island services, with fueling temporarily shifted to a nearby fueling facility.
Following system startup, remove the temporary vacuuming arrangement and complete the planned transition.
The design coordinates six new dispensers with relocated vacuum equipment, air and water service reels, concrete apron work and protective bollards.
These interfaces matter to constructability: the product piping, equipment locations and service connections must work together within the existing facility.
The goal is to give the construction team a defined installation plan while accounting for how rental vehicles move through fueling, washing and vacuuming.

The anticipated permitting process includes review through Hawaii Department of Transportation Airports (DOTA) departments, including Environmental Engineering, as well as the Kauai County Building Department and Fire Marshal’s Office.
ZE’s contracted scope includes permitting and construction management. The agency pathway described here outlines the anticipated process; it does not represent submitted permit applications or issued permits. Construction, commissioning and operating outcomes remain future stages.

Dallas, Texas
Rental-car fleet fueling
View project
Westchester County, New York
School-bus fleet fueling
View project
West Babylon, New York
Automotive repair and maintenance
View projectTalk with ZE about your piping, dispensing capacity and operating requirements.