Design first, then build with confidence.
Zambrano Enterprises develops detailed fuel-system designs that give contractors a clear roadmap for construction. Equipment, configuration and regulatory requirements are resolved on paper, not in the field.
The call usually starts like this.
If one of these sounds like your site, the form above is the fastest way to get a defined path back.
We're planning a new fueling system and want a defined scope before we ask contractors to bid.”
Two contractors quoted the same job and the proposals describe two different systems.”
Our project stalled in plan review because the drawings did not answer the AHJ's questions.”
We're expanding and need to know what the site, the fire code and the county will allow before we commit.”
Our engineer or architect needs a fuel-system specialist for the tank and dispensing portion of a larger project.”
Concrete deliverables, not a proposal to write one.
- Permit drawing set: site plan, tank and piping layout, dispenser and sump details, sections and notes
- Equipment schedule with model-level selections and listings (UL 142, UL 2085 and other applicable listings)
- Written basis of design covering applicable codes, AHJ requirements and operating assumptions
- AHJ application package (SCDHS HMM-001, NCDH or WCDOH equivalents, NYSDEC PBS, VA DEQ, local building and fire)
- Construction scope narrative for contractor bidding
- RFI and submittal responses through construction
- Closeout documentation: as-built markups, test certificates and registration updates
How ZE approaches fuel system design.
Zambrano Enterprises provides specialized fuel-system design and technical consulting services. When professional engineering review or certification is required, ZE coordinates with appropriately licensed Professional Engineers through established professional relationships nationwide.
Design first. Build with confidence.
Zambrano Enterprises develops detailed fuel-system designs intended to provide contractors with a clear roadmap for construction. Critical equipment selections, system configurations and regulatory requirements are evaluated during design rather than unnecessarily left for resolution in the field.
All three sides of the project
ZE understands what the owner needs operationally and financially, what the AHJ requires for approval and compliance, and what the contractor needs to actually build the system. The design is written so all three can read it and agree on it.
Owner-led, specialist-direct
Matt Zambrano, B.S. Civil Engineering, Georgia Institute of Technology, has spent 10+ years specializing in petroleum storage and fuel dispensing systems. Matt remains directly involved in the technical design and client coordination from the first conversation through closeout.
How the work runs.
- STEP 1
Investigate
Site walk, existing tank and registration records, test history, utilities, groundwater and setbacks, plus a working session on how the facility actually fuels and what it needs to store.
- STEP 2
Develop a compliance and design strategy
Identify every AHJ with a say in the project, confirm which code editions and county articles apply, and settle the big decisions: UST or AST, tank listing, capacity, location, dispensing method and phasing.
- STEP 3
Design
Produce the drawing set, equipment schedule and basis of design. Equipment, configuration, codes, AHJ requirements, existing conditions, operating requirements and constructability are all vetted here, so the contractor is pricing a resolved system.
- STEP 4
Permit
Assemble and submit the application packages, respond to plan-review comments and carry the project to a permit to construct. Where permitting is required, it is integrated into the design process rather than treated as an afterthought.
- STEP 5
Support construction and closeout
Bid review, submittal review, RFI responses, field questions and coordination of required tests and inspections, through to the permit to operate and updated registrations.
About fuel system design.
Not answered here? Ask directly.
Talk to a Fuel-System SpecialistWhere does Zambrano Enterprises work?
Specialized fuel-system design, permitting and compliance support nationwide. ZE is based in Central Virginia and serves clients across the country. The deepest concentration of regulatory experience is in New York, including Suffolk County under SCDHS Article 12, Nassau County, Westchester County, New York City and NYSDEC Part 613 statewide, and that depth transfers to the federal rules and the state and county programs that apply wherever the project sits.
What does Zambrano Enterprises actually vet during design?
Seven things, on every project: the equipment (tank listing, piping material, sumps, dispensers, ATG and fuel control), the system configuration (how those parts connect and control each other), the applicable codes (NFPA 30, 30A and 110, the state fire code and 40 CFR 280 where USTs are involved), the AHJ requirements (SCDHS Article 12, the NCDH storage ordinance, WCDOH Article XXV, NYSDEC Part 613, VA DEQ 9VAC25-580 and 9VAC25-91, local building and fire officials), the existing conditions on the site, the owner's operating requirements, and constructability. The deliverable is a complete, functional, compliant system on paper and a clear roadmap for the contractor.
What does design-first mean for me as the owner?
A fuel system designed to be compliant and functional. A project designed and permitted around the specific requirements of the applicable AHJs. A more clearly defined construction scope. Fewer field assumptions and less troubleshooting. Fewer avoidable change orders and delays. Better contractor bids, because everyone is pricing substantially the same defined system.
Do you provide stamped drawings?
Zambrano Enterprises provides specialized fuel-system design and technical consulting services. When professional engineering review or certification is required, ZE coordinates with appropriately licensed Professional Engineers through established professional relationships nationwide. In practice, ZE prepares the design and permit package. Reviewed and sealed by an appropriately licensed design professional when required by the applicable AHJ. Suffolk County's HMM-001 permit to construct is one example.
Can I use a contractor I already work with?
Yes. Zambrano Enterprises is built to work with the entire project team, and a good deal of ZE's work arrives through petroleum contractors. ZE works directly for the owner or alongside the contractor and project team. If you do not have a contractor yet, the design gives you a defined scope to send out for comparable pricing.
How far along should the project be before I call?
Earlier is cheaper. The best time is before a lease is signed, a tank is ordered or a permit is filed, when siting and capacity are still open. ZE also picks up projects mid-stream: a rejected submittal, a contractor who needs a permit set to price against, or a design that another firm started and could not finish.
Usually part of the same project.

UST System Design
Underground storage tank systems: tank, piping, sumps, leak detection and dispensing, designed to the applicable federal, state and county rules.

AST System Design
Aboveground storage tank systems for fuel, fuel oil, waste oil and generator diesel, sized and sited to fire code and AHJ requirements.

Fuel Tank Permitting
Permit due diligence and approvals from every authority having jurisdiction, handled as part of the design rather than an afterthought.