Equipment Rental Facility Fleet Fueling Relocation — Farmingdale, New York

Existing tanks.
A new fleet-fueling facility.

ZE designed and permitted the installation of existing diesel and gasoline tanks at a new equipment-rental facility, coordinating fuel storage, dispensing and protective systems.

Farmingdale, New York · Construction complete

Explore the fueling design ↓
Existing outdoor tank and dispensing equipment documented during relocation planning
Existing conditions: fueling equipment documented for relocation planning. This photograph does not show the completed installation at the new facility.
4,000 galDiesel AST
500 galGasoline AST
Fleet fuelingEquipment-rental facility
Design & permitsZE’s core contribution
01 / Investigate & design

A relocation requires
more than moving equipment.

An equipment-rental business relocated between two Farmingdale properties and planned to bring its existing diesel and gasoline tanks to the new facility.

Although the tanks were existing equipment, their installation at the receiving facility required new design and permitting. The outdoor fueling installation incorporated a 4,000-gallon diesel AST and a 500-gallon gasoline AST.

ZE’s work included an on-site investigation led by Matt Zambrano to evaluate existing conditions. Working for the project’s contractor, ZE developed the fueling-system design drawings and permit submissions and assisted the fire-suppression contractor with its design plan.

02 / Outdoor fueling design

Bring storage and dispensing
into one coordinated layout.

The new-site design accounted for the existing tanks and the equipment needed to support diesel and gasoline fueling.

FUEL STORAGE & DISPENSING

Integrate the existing tanks

The design connects the diesel and gasoline ASTs with dispensing, product piping, spill containment and tank monitoring at the receiving facility.

ACCESS & PROTECTION

Coordinate the surrounding installation

Concrete support, vehicle protection and emergency shutoff provisions were coordinated with the fueling layout and specialty fire-suppression design.

03 / Coordinate the supporting systems

Tank design connects
with the rest of the facility.

ZE coordinated the tank-system design and permitting requirements for installation at the receiving facility.

ZE also assisted the fire-suppression contractor with a system design plan. This work supported coordination between the fueling installation and the specialty contractor’s suppression system.

ZE provided tank-system design and permitting services to the project contractor. The approved tank-system designs were certified by a professional engineer licensed in New York. Fire-suppression work is described as design assistance to the specialty contractor.

Wide view of the installed outdoor fueling island during site finishing work
The new fueling island during site finishing work, showing the tank arrangement, dispensing area, concrete pad and protective bollards.
The receiving facility

A dedicated area
for fleet fueling.

The outdoor design brings diesel and gasoline storage, dispensing and vehicle protection together at the new facility. This wider view shows how the equipment fits within the yard.

Equipment integration

Storage, dispensing
and fire protection.

The gasoline tank and dispenser sit alongside the fire-suppression equipment within the protected fueling area.

ZE provided tank-system design and permitting, with fire-suppression design-plan assistance to the specialty contractor.

Gasoline dispenser, tank and adjacent fire-suppression equipment
Installed gasoline dispensing arrangement, with the tank, suppression equipment and protective bollards shown together.
04 / Permitting & current progress

Construction complete.
Agency closeout progressing.

The outdoor fueling system has reached the Suffolk County Department of Health Services (SCDHS) Permit to Operate stage, with administrative closeout pending. The Town of Babylon is completing its remaining inspections.

Construction is complete. The remaining steps concern agency closeout rather than installation work.

Project details
Location
Farmingdale, New York
Facility / industry
Equipment-rental fleet fueling
ZE role
Tank-system design and permitting for the project contractor, with fire-suppression design-plan assistance.
Services represented
AST system design; fleet fueling; permitting; relocation planning; specialty-system coordination