Skip to content
Zambrano EnterprisesZambrano
Fleet fueling island with diesel dispensers and aboveground storage at a municipal yard
Industries

Fuel systems designed around how your facility actually operates.

A transit yard, a service station, a hospital generator and a marina dock each carry their own equipment, fire-code sections and authorities having jurisdiction. ZE designs and permits to the specifics of each one.

15+ years in fuel systemsOwner-led, one point of contactNationwide, deep New York experience
How ZE works

One specialist, three sides of the project.

Whatever the industry, a fuel-system project has the same three parties. ZE designs to all of them at once so the drawings the AHJ approves are the drawings the contractor builds and the system the owner wanted.

  • The owner

    What the facility needs operationally and financially: throughput, capacity, downtime tolerance, and a scope that can be bid and budgeted.

  • The AHJ

    What the county health department, DEC or DEQ, fire marshal and building official each require for approval, inspection and ongoing compliance.

  • The contractor

    What the crew needs to actually build it: equipment called out, configuration drawn, sequencing and testing spelled out before mobilization.

Tell us about the facility.

Photos, a notice, an inspection report, or a few sentences. Most inquiries receive a response within one business day.

Photos, notices, reports

Files are used only to evaluate your project inquiry and are handled in accordance with our Privacy Policy.

Or call (845) 642-7754

Send us the situation. We'll tell you the path.

Photos, a violation notice, an inspection report, or just a description of the site. Matt reviews every inquiry personally and comes back with a clear next step.

CallDiscuss Your Project